 |
| Structural Risk Management |
|
| Risk Management
Occasionally, a property loss involves damage which could cause collateral peril. A risk management plan can be developed accompanied by a demolition recommendation to minimize further risk to property or personnel.
|
Planning and Consulting
When a structure is deemed repairable, there may be a need for analyzing the strength of the building, with the existing and proposed replacement materials. Often, currently available building materials may differ from the original design. Alternative acceptable solutions are recommended which meet or exceed the requirements while complying with codes and standards of construction.
|
 |
| Reconstruction considerations and alternatives. |
|
|
 |
| Drawings, prints and renderings. |
|
|
Architectural services
Architectural services and drawings are available for commercial, residential, new and restoration construction, as required.
|
|